August 6, 201114 yr Hey Guys,Just reading through the checlists in the FCOM.v1 and read this on page 77 "The Preliminary Preflight Procedure assumes that the Electrical Power Up supplementary procedure is complete." I want to know where the checklist is (or what the sequence is) for the electrical power. Andy Andy Hinton Dell Studio XPS 435MT, Intel Core i7 CPU 920 @ 2.67 GHz , 8GB RAM,Windows 7 Home Premium (64 Bit), NIVIDA Ge Force GTX 460
Create an account or sign in to comment