Hello folks,A friend of mine, who flies the 747F has told me that they only connect one external source anyway, almost never both.There is no point, as one supply is enough to power the systems, and if both are connected, then the handlers cannot do their work on the main deck..The freighter 747 manual says that EXT PWR 2 should only be used if desired, as it disconnects the power from the cargo handling on the main deck.The same goes for APU GEN 2 as well.Happy landingsSouthwester