September 17Sep 17 I decided to read the BA A380 FCOM before applying power to the A380 and came across something interesting.External Power is actually applied in a specific order to ensure the fastest boot times on the display units. 2,3,1,4.I kept on reading and found out some more interesting things which I summarised in a short video in case anyone is curious about aircraft system nuances like myself.These include the considerations required when your starting the APU on 2 units of External Power only vs 4 as well as keeping the external power connected (ideally) even after the APU is started. Also what constitutes an APU overload is fascinating.I have to admit, I'm more a Boeing 747 guy, but I do love a bit of A380.If anyone else has tried this on the IniBuilds A380, how much time is saved by applying external power this way?
Create an account or sign in to comment