August 27, 200520 yr Hi guysAssembled my overhead yesterday. Not completely ready yet. Now 65 korries to make with leds etc. regardsNorberthttp://home.wanadoo.nl/norbert.boschhttp://forums.avsim.net/user_files/125528.jpghttp://forums.avsim.net/user_files/125530.jpghttp://forums.avsim.net/user_files/125538.jpg
August 27, 200520 yr That's Nice Nobert... How long did it take you to do all of the panel work with your machine?
August 27, 200520 yr Author Well ,designing takes about 2 to 3 hours for every panel.Cutting is straigtforward, 45 min / panel. I then painted them all in one pas.Engraving takes another 3 hours per panel. So it is timeconsuming and I suggest that if you do not like this part (buy them), but I liked it very much to make them myself.Norbert
August 28, 200520 yr Excellent work, Norbert. Very nice craftsmanship. Can't wait to see it fully assembled and lit up. :-)
August 28, 200520 yr Hi Norbert,Well done! My first thought were that you had bought your panels from FDS..., but no, you did it yourselves, great!Groeten uit Delft,Nicowww.nicokaan.nl
August 28, 200520 yr Author Thanks for the compliments guys. I will post more when the korries and all the hardware is inside.regardsNorbert
August 28, 200520 yr That's a great job on the framework construction. I built mine for the Boeing 727 almost the same as you did.I have an additional crossmember near the front for the interior and exterior lighting control panels below the four main bays.
August 31, 200520 yr Norbert,Absolutely stunning !!!!!!!It deserves a temporarily place near your bed for continuous looking at .....Hessel Oosten
August 31, 200520 yr Author Thanks HesselThat's a good idea. A temporary overhead in my bedroom, that will give me sweet dreams for sure.regardsNorbert
Create an account or sign in to comment